How do single, trefoil and quad cleats differ?
A single cleat holds one cable, a trefoil cleat holds three single-core cables in a triangular formation, and a quad selection follows the drawing-defined positions of four cables.

Compare 316L stainless steel cable-cleat arrangements for project power routes. Confirm the single, trefoil or quad layout, cable outside diameters, liner, mounting and applicable restraint evidence.
SKU: ALI-1601812404839
Initial response within 1 hour during business hours.
Specifications for the selected model are available on request. Send your model or drawing, required dimensions and quantity so we can confirm the product details before quotation.
Specify one cable per single cleat, three single-core cables in a trefoil formation, or the exact four-cable arrangement shown on the project drawing. Include all cable outside diameters and centre distances.
Prepare a model-by-model schedule for the actual circuits. Each proposed assembly needs suitable dimensional, material and installation evidence; confirm the test scope for the specified formation.
Younxin can provide certification and test documentation for project procurement and technical review.
Approval documentation is available for applicable cable-cleat models. Confirm the certificate scope for the proposed model with your quotation.
STIEE short-circuit test reports are available for the tested trefoil and quad cable-cleat assemblies.
UV-aging and needle-flame test documentation is available for the stated sample models.
Certificates and complete test reports are provided on request. Confirm the covered model, assembly and installation conditions for your project.
For oil and gas projects, identify process-plant, LNG utility, coastal-terminal or offshore-module exposure and send the corrosion specification with the electrical cable schedule. For data-center projects, identify the transformer, generator, switchgear, UPS or riser route and its design requirements.
Confirm the body material, liner, fasteners and support interface as one assembly. Provide cable outside diameter, formation, peak and RMS short-circuit current, fault duration, proposed cleat spacing and mounting drawings for review.
Request the current model drawing, material information, installation instructions and test evidence applicable to the offered assembly. An IEC 61914 reference should be checked against the report’s sample and installation conditions. Confirm fire, smoke, halogen, UV and magnetic-permeability requirements separately where specified.
Send the model or drawing, actual cable outside diameter, arrangement, quantity and destination. Include the EPC document schedule and required delivery date. Younxin can review the supplied requirements before preparing a quotation.
Corrosion exposure, cable-ladder interfaces, vertical retention and restraint evidence.
Oil and gas project guideGenerator, transformer, UPS and switchgear feeder schedules with model-specific submittals.
Data-center project guideA single cleat holds one cable, a trefoil cleat holds three single-core cables in a triangular formation, and a quad selection follows the drawing-defined positions of four cables.
Prepare separate model and quantity lines for the actual cable diameters, formations and mounting conditions. Identify the circuit and installation zone for each line.
Request the offered model drawing, material information, installation instructions and applicable restraint evidence. Add project-specific corrosion, liner, fire or smoke requirements where specified.
State the acceptance criterion and required test or material documentation with the RFQ. Confirm the offered finished assembly against that requirement.