Get a Quote
Get a Quote

Nigeria: 15–35 kV Power Equipment and Electrical Project Tools Supply

Younxin Engineering Team · · 4 min read · 624 words

Nigeria · 15–35 kV Project Supply

Power Equipment and Electrical Project Tools

Coordinated supply of medium-voltage equipment, line hardware, tools and safety items, consolidated and protected for export container loading.

Project Overview

Younxin supported a Nigerian electrical power project with a mixed package covering a 400 kVA distribution transformer, 15–35 kV instrument transformers and insulators, line hardware, copper busbars, heat-shrink materials, construction tools and personal protective equipment. The goods were consolidated by specification, wrapped or crated as appropriate, and prepared for container shipment.

Country
Nigeria
Voltage scope
15–35 kV
Main transformer
400 kVA, 15/0.4 kV
Supply scope
Equipment, hardware, tools and PPE

Materials Supplied

The list below reproduces the product name, model or specification, unit and confirmed quantity from the shipment material schedule. Duplicate rows with the same item, model and unit have been consolidated.

ProductModel / SpecificationUnitQuantity
Tin-plated copper bar20×3m30
Tin-plated copper bar30×4m60
Tin-plated copper bar30×5m60
Tin-plated copper bar40×5m60
Tin-plated copper bar40×6m60
Tin-plated copper bar50×6m60
Tin-plated copper bar60×6m30
Tin-plated copper bar60×8m30
Glass insulatorU70pcs600
Glass insulatorU120pcs500
Metal expansion bolt14×100pcs1,000
Metal expansion bolt12×100pcs5,040
Metal expansion bolt10×90pcs2,000
Metal expansion bolt8×80pcs3,200
Cutting discØ400pcs300
Cutting discØ350pcs200
Cutting discØ105pcs2,400
Heat-shrink tubeØ150m100
Heat-shrink tubeØ120m100
Heat-shrink tubeØ100m100
Heat-shrink tubeØ80m100
Heat-shrink tubeØ60m100
Heat-shrink tubeØ40m100
Heat-shrink tubeØ30m100
Half-coated work gloves—pairs2,000
Welding electrodesJ422 Ø3.2cartons10
Welding electrodesJ422 Ø2.5cartons5
Impact drill bit8×160pcs160
Impact drill bit10×160pcs160
Impact drill bit12×160pcs160
Impact drill bit14×200pcs110
Impact drill bit16×200pcs80
Twist drill bitØ4.2pcs50
Twist drill bitØ5.2pcs50
Twist drill bitØ6.5pcs50
Heater with temperature/humidity controller—sets5
Current transformerLZZBJ9-40.5, 400/5, 0.2S/0.5/5P30pcs3
Power transformerS11-400/15-0.4 kVunit1
Soft nylon ropeØ14 or Ø16m200
Concrete mixer350unit1
Two-wheel solid-tyre handcart—units15
Single-wheel pneumatic-tyre handcart—units10
Suspension jack10 t top / 5 t liftingpcs2
Machine skate12 tpcs2
Machine skate6 tpcs2
An Gong workwear170sets20
An Gong workwear175sets50
An Gong workwear180sets50
An Gong workwear185sets20
An Gong safety shoes40pairs40
An Gong safety shoes41pairs40
An Gong safety shoes42pairs40
An Gong safety shoes43pairs20
Safety helmet——100
Reflective safety vest—pcs300
Zhong Gong workwear170sets6
Zhong Gong workwear175sets20
Zhong Gong workwear180sets40
Zhong Gong workwear185sets4
Zhong Gong safety shoes40pairs20
Zhong Gong safety shoes41pairs15
Zhong Gong safety shoes42pairs20
Zhong Gong safety shoes43pairs5
Strain clampNLL-3#pcs300
Strain clampNLL-4#pcs300
Parallel groove clampJB-3pcs500
Parallel groove clampJB-4pcs500
Right-angle link plate—pcs300
Ball eye—pcs300
Socket clevis—pcs300
Porcelain post insulator35 kVpcs500
Cloth gloves—pairs1,000
Voltage transformer30 kVsets2
Voltage transformer15 kVset1
Galvanized angle steelØ40×4×6000pcs100
Tape measure5×25pcs100
Impact drill bit6×160pcs40
Impact drill bit14×160pcs50
Impact drill bit16×160pcs20
Ceramic shield for plasma cutting torch—pcs50

Packing and Shipment

These project photos show export packing, container loading and shipment preparation only. They do not show site installation or commissioning.

Need cable products for your project?

Get a Quote →
Packed electrical project materials positioned inside an export container for loading
Packed materials positioned inside the export container during loading.
Wrapped electrical equipment and crated materials secured inside an export container
Wrapped equipment, a crate and palletized materials prepared for shipment.
Wrapped transformer and electrical equipment packed inside an export container
Transformer and associated equipment protected for container transport.

Delivery Preparation

Before shipment, the mixed package was grouped by specification and checked against the material schedule. Heavy equipment was palletized or wrapped, smaller components were boxed, and the container loading arrangement was prepared to reduce movement during transport.

Frequently Asked Questions

What voltage levels were included in this Nigeria project?

The confirmed equipment scope included 15 kV and 30 kV voltage transformers, 35 kV porcelain post insulators, and a 400 kVA transformer rated 15/0.4 kV.

Did the supply include tools and safety equipment?

Yes. The schedule included drill bits, cutting discs, handcarts, machine skates, workwear, safety shoes, helmets, gloves and reflective vests.

What do the project images show?

They show packing, container loading and shipment preparation. They are not installation, construction-completion or commissioning photos.

Planning a Similar Power Project?

Send your voltage level, equipment schedule, quantities and delivery destination for technical matching and export packing support.

Request a Project Quote

Younxin Engineering Team

Senior Cable Engineer

13+ years OEM/ODM experience serving 80+ countries. Specializing in power cable accessories, heat shrink technology, and cable jointing solutions.

Related Products

Ready to Source Quality Cable Products?

Get an initial response within 1 hour during business hours →

Need Power Project Support?

Products · Quotation · Technical Support

BOM
List
Drawing Catalog Alternatives WhatsApp
Contact sales