Medium-Voltage Cable Joint Selection Guide

Younxin Engineering Team · · Updated: October 13, 2026 · 3 min read · 532 words

Quick answer: Select a joint from both cable ends. Confirm that the two cables have compatible voltage class, conductor, insulation dimensions, screen/armour construction and bonding requirements before choosing a kit.

Information required before selection

A joint connects two complete cable systems, so data is required for Cable A and Cable B.

  • U0/U (Um) and cable standard for both sides
  • Conductor material, class, size and diameter for both sides
  • Insulation diameter over conductor and over insulation
  • Metallic screen type and cross-section
  • Armour and outer-sheath construction
  • Direct-buried, tray, tunnel, duct or submerged environment
  • Bonding, link-box and sheath-voltage requirements

Technical selection framework

Review areaWhat the buyer should confirmWhy it changes the supply
Conductor connectorConfirm material combination, size range and installation method.Cu-Cu, Al-Al and transition connections require different review.
Electrical interfaceMatch insulation diameter and stress-control range on both cables.Equal cross-section does not guarantee equal insulation dimensions.
Screen continuityRebuild the metallic screen with adequate current capability.Screen treatment affects fault-current path and induced voltages.
Armour/sheathRestore mechanical protection and environmental sealing.Direct burial and wet environments demand careful outer protection.
Bonding arrangementConfirm single-point, both-end or cross-bonded system requirements.Incorrect bonding can create sheath voltages or circulating currents.
  1. Collect both cable datasheets.
  2. Compare every construction layer.
  3. Define conductor and screen connection.
  4. Select stress-control and outer-seal system.
  5. Approve installation method, inspection and test plan.

Common RFQ mistakes

  • Assuming both 240mm² cables have identical dimensions.
  • Omitting screen-wire cross-section and fault duty.
  • Ignoring aluminium-to-copper transition requirements.
  • Ordering a standard straight joint for a special bonding system.

What a quotation package should contain

The joint submission should include compatibility range for both cables, connector, stress-control components, screen/armour continuity, outer protection, installation dimensions, instructions and type-test references.

Project-based example

When an existing cable is joined to a replacement cable from another manufacturer, a dimensional comparison sheet is often more important than the trade name. This should be completed before the outage or installation window.

Need equipment matched to your project?

Get a Quote →

Standards note: IEC 60502-4 may apply within its voltage scope. Special bonding, transition or repair joints need project-specific engineering beyond a standard kit code.

Two-cable comparison sheet for a joint RFQ

Complete one column for each cable end. Mark missing values as “to be confirmed” and attach the cable datasheets; do not assume the two constructions match because the conductor sizes are equal.

Cable A and Cable B comparison
ParameterCable ACable B
Voltage designation U0/U (Um)To be confirmedTo be confirmed
Conductor material, size and classTo be confirmedTo be confirmed
Diameter over insulationTo be confirmedTo be confirmed
Metallic screen type and cross-sectionTo be confirmedTo be confirmed
Armour and outer sheathTo be confirmedTo be confirmed
Cable outside diameterTo be confirmedTo be confirmed

Add the joint location, bonding arrangement, connector method, required quantity and installation window. The quotation should identify the compatibility range for both ends and any separate screen, armour or outer-seal items.

Compare cable joint and termination families. If the cable ends at equipment instead of joining another cable, review the 10kV single-core cold-shrink termination for 120–240 mm² as a separate accessory type; confirm its insulation-diameter range before selection.

Younxin Engineering Team

Power Systems Engineering & Procurement Team

15+ years of project sourcing and OEM/ODM experience across transmission, distribution, substations, cable systems and power equipment.

Products for this selection guide

You May Also Like

Ready to Source Power Equipment for Your Project?

Get an initial response within 1 hour during business hours →

Need Power Project Support?

Products · Quotation · Technical Support

BOM
List
Drawing Catalog Alternatives WhatsApp
Contact sales