info@younxin.com +86 138 2213 5504 Mon–Fri 08:00–18:00 UTC+8
Get a Quote
Get a Quote

Transformer Maintenance Parts RFQ Guide

Short answer: transformer maintenance parts RFQs should include transformer rating, voltage ratio, drawing, part position, bushing interface, gasket size, oil compatibility and test requirement.

Maintenance parts table

Bushings Confirm HV, LV or neutral side, voltage, current, flange, thread and terminal dimensions.
Gaskets and seals Match oil compatibility, temperature, size and transformer tank interface.
Tap changer parts Confirm model, current rating, steps, drawing and manufacturer reference.
Protection accessories Include breather, oil level gauge, pressure relief device, thermometer and terminal parts when needed.

RFQ parameters

Common wrong selection

Transformer spare parts should not be quoted by part name alone. Drawing and mounting dimensions are usually required.

Need Power Project Support?

Products · Quotation · Technical Support

BOM
List
Drawing Catalog Alternatives WhatsApp